Data Center Construction Market Size to Worth Around US$ 369.6 Billion by 2030
[150+ Pages Report] As per the latest Research and survey report issued by Precedence Research, the global data center construction market was valued at around USD 218.88 billion in 2021 and is expected to register revenues worth USD 369.6 billion by the end of 2030, growing at an exceptional CAGR of approximately 6.7% between 2022 and 2030.

Download Free Sample Copy with TOC@ https://www.precedenceresearch.com/sample/1704
Data Center Construction Market Report Scope
A recent study by Precedence Research on the data center construction market offers a forecast for 2022 and 2030. The study analyzes crucial trends that are currently determining the growth of the data center construction market. This report explicates on vital dynamics such as the drivers, restraints, and opportunities for key market players, along with key stakeholders as well as emerging players associated with the manufacturing of data center construction. The study also provides the dynamics that are responsible for influencing the future status of the data center construction market over the forecast period.
A detailed assessment of the data center construction market value chain analysis, business execution, and supply chain analysis across regional markets has been covered in the report. A list of prominent companies operating in the data center construction market along with their product portfolio enhances the reliability of this comprehensive research study.
Competition Landscape
The report has engulfed a chapter on the global data center construction market’s competitive landscape, which provides detailed analysis and insights on companies offering data center construction. Profiles of key companies, along with a strategic overview of their M&A and expansion plans across geographies, have been delivered in this chapter. This chapter is priceless for report readers, as its enables them in gauging their growth potential in the market and implement key strategies for extending their market reach.
This chapter offers key recommendations for both new and existing market participants, enabling them to emerge sustainably and profitably. Intelligence on the market players has been delivered on the basis of their product overview, SWOT analysis, key developments, key financials and company overview. Occupancy of these market participants has been tracked by the report and portrayed via an intensity map.
Read Also@ Enzymes Market Size to Worth Around US$ 20.5 Billion by 2030
Some of the Prominent Players in the Data Center Construction Market Include:
- Page Southerland Page
- Syska Hennessy Group
- Holder Construction Group
- Turner Construction Company
- Jones Engineering Group
- DPR Construction
- Arup Group
- Corgan Associates Inc.
- AECOM
- Gensler
Data Center Construction Market Segmentation
By IT Infrastructure
- Networking Equipment
- Servers
- Storage
By Power Distribution and Cooling Infrastructure
- Power Distribution
- Cooling
By Tier Type
- Tier 1
- Tier 2
- Tier 3
By End Use
- IT & Telecom
- BFSI
- Government & Defense
- Healthcare
- Energy
- Others
By Size of Data Center
- Small and Medium-Scale Data Center
- Large-scale Data Center
Regional Segmentation
- Asia-Pacific [China, Southeast Asia, India, Japan, Korea, Western Asia]
- Europe [Germany, UK, France, Italy, Russia, Spain, Netherlands, Turkey, Switzerland]
- North America [United States, Canada, Mexico]
- South America [Brazil, Argentina, Columbia, Chile, Peru]
- Middle East & Africa [GCC, North Africa, South Africa]
Regional Analysis
The research report includes a detailed study of regions of North America, Europe, China, Japan and Rest of the World. The report has been curated after observing and studying various factors that determine regional growth such as economic, environmental, social, technological, and political status of the particular region. Analysts have studied the data of revenue and manufacturers of each region. This section analyses region-wise revenue and volume for the forecast period of 2022 to 2030. These analyses will help the reader to understand the potential worth of investment in a particular region.
The report provides in-depth segment analysis of the global data center construction market, thereby providing valuable insights at macro as well as micro levels. Analysis of major countries, which hold growth opportunities or account for significant share has also been included as part of geographic analysis of the data center construction market.
The report includes country-wise and region-wise market size for the period 2022-2030. It also includes market size and forecast by segments in terms of production capacity, price and revenue for the period 2022-2030.
Why should you invest in this report?
If you are aiming to enter the global data center construction market, this report is a comprehensive guide that provides crystal clear insights into this niche market. All the major application areas for data center construction are covered in this report and information is given on the important regions of the world where this market is likely to boom during the forecast period of 2022-2030 so that you can plan your strategies to enter this market accordingly.
Besides, through this report, you can have a complete grasp of the level of competition you will be facing in this hugely competitive market and if you are an established player in this market already, this report will help you gauge the strategies that your competitors have adopted to stay as market leaders in this market. For new entrants to this market, the voluminous data provided in this report is invaluable.
Table of Contents
Chapter 1. Introduction
1.1. Research Objective
1.2. Scope of the Study
1.3. Definition
Chapter 2. Research Methodology
2.1. Research Approach
2.2. Data Sources
2.3. Assumptions & Limitations
Chapter 3. Executive Summary
3.1. Market Snapshot
Chapter 4. Market Variables and Scope
4.1. Introduction
4.2. Market Classification and Scope
4.3. Industry Value Chain Analysis
4.3.1. Raw Material Procurement Analysis
4.3.2. Sales and Distribution Channel Analysis
4.3.3. Downstream Buyer Analysis
Chapter 5. COVID 19 Impact on Data Center Construction Market
5.1. COVID-19 Landscape: Data Center Construction Industry Impact
5.2. COVID 19 – Impact Assessment for the Industry
5.3. COVID 19 Impact: Global Major Government Policy
5.4. Market Trends and Opportunities in the COVID-19 Landscape
Chapter 6. Market Dynamics Analysis and Trends
6.1. Market Dynamics
6.1.1. Market Drivers
6.1.2. Market Restraints
6.1.3. Market Opportunities
6.2. Porter’s Five Forces Analysis
6.2.1. Bargaining power of suppliers
6.2.2. Bargaining power of buyers
6.2.3. Threat of substitute
6.2.4. Threat of new entrants
6.2.5. Degree of competition
Chapter 7. Competitive Landscape
7.1.1. Company Market Share/Positioning Analysis
7.1.2. Key Strategies Adopted by Players
7.1.3. Vendor Landscape
7.1.3.1. List of Suppliers
7.1.3.2. List of Buyers
Chapter 8. Global Data Center Construction Market, By IT Infrastructure
8.1. Data Center Construction Market, by IT Infrastructure, 2022-2030
8.1.1. Networking Equipment
8.1.1.1. Market Revenue and Forecast (2017-2030)
8.1.2. Servers
8.1.2.1. Market Revenue and Forecast (2017-2030)
8.1.3. Storage
8.1.3.1. Market Revenue and Forecast (2017-2030)
Chapter 9. Global Data Center Construction Market, By Power Distribution and Cooling Infrastructure
9.1. Data Center Construction Market, by Power Distribution and Cooling Infrastructure, 2022-2030
9.1.1. Power Distribution
9.1.1.1. Market Revenue and Forecast (2017-2030)
9.1.2. Cooling
9.1.2.1. Market Revenue and Forecast (2017-2030)
Chapter 10. Global Data Center Construction Market, By Tier Type
10.1. Data Center Construction Market, by Tier Type, 2022-2030
10.1.1. Tier 1
10.1.1.1. Market Revenue and Forecast (2017-2030)
10.1.2. Tier 2
10.1.2.1. Market Revenue and Forecast (2017-2030)
10.1.3. Tier 3
10.1.3.1. Market Revenue and Forecast (2017-2030)
Chapter 11. Global Data Center Construction Market, By End Use
11.1. Data Center Construction Market, by End Use, 2022-2030
11.1.1. IT & Telecom
11.1.1.1. Market Revenue and Forecast (2017-2030)
11.1.2. BFSI
11.1.2.1. Market Revenue and Forecast (2017-2030)
11.1.3. Government & Defense
11.1.3.1. Market Revenue and Forecast (2017-2030)
11.1.4. Healthcare
11.1.4.1. Market Revenue and Forecast (2017-2030)
11.1.5. Energy
11.1.5.1. Market Revenue and Forecast (2017-2030)
11.1.6. Others
11.1.6.1. Market Revenue and Forecast (2017-2030)
Chapter 12. Global Data Center Construction Market, By Size of Data Center
12.1. Data Center Construction Market, by Size of Data Center, 2022-2030
12.1.1. Small and Medium-Scale Data Center
12.1.1.1. Market Revenue and Forecast (2017-2030)
12.1.2. Large-scale Data Center
12.1.2.1. Market Revenue and Forecast (2017-2030)
Chapter 13. Global Data Center Construction Market, Regional Estimates and Trend Forecast
13.1. North America
13.1.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.1.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.1.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.1.4. Market Revenue and Forecast, by End Use (2017-2030)
13.1.5. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.1.6. U.S.
13.1.6.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.1.6.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.1.6.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.1.6.4. Market Revenue and Forecast, by End Use (2017-2030)
13.1.7. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.1.8. Rest of North America
13.1.8.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.1.8.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.1.8.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.1.8.4. Market Revenue and Forecast, by End Use (2017-2030)
13.1.8.5. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.2. Europe
13.2.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.2.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.2.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.2.4. Market Revenue and Forecast, by End Use (2017-2030)
13.2.5. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.2.6. UK
13.2.6.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.2.6.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.2.6.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.2.7. Market Revenue and Forecast, by End Use (2017-2030)
13.2.8. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.2.9. Germany
13.2.9.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.2.9.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.2.9.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.2.10. Market Revenue and Forecast, by End Use (2017-2030)
13.2.11. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.2.12. France
13.2.12.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.2.12.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.2.12.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.2.12.4. Market Revenue and Forecast, by End Use (2017-2030)
13.2.13. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.2.14. Rest of Europe
13.2.14.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.2.14.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.2.14.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.2.14.4. Market Revenue and Forecast, by End Use (2017-2030)
13.2.15. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.3. APAC
13.3.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.3.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.3.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.3.4. Market Revenue and Forecast, by End Use (2017-2030)
13.3.5. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.3.6. India
13.3.6.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.3.6.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.3.6.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.3.6.4. Market Revenue and Forecast, by End Use (2017-2030)
13.3.7. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.3.8. China
13.3.8.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.3.8.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.3.8.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.3.8.4. Market Revenue and Forecast, by End Use (2017-2030)
13.3.9. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.3.10. Japan
13.3.10.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.3.10.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.3.10.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.3.10.4. Market Revenue and Forecast, by End Use (2017-2030)
13.3.10.5. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.3.11. Rest of APAC
13.3.11.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.3.11.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.3.11.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.3.11.4. Market Revenue and Forecast, by End Use (2017-2030)
13.3.11.5. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.4. MEA
13.4.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.4.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.4.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.4.4. Market Revenue and Forecast, by End Use (2017-2030)
13.4.5. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.4.6. GCC
13.4.6.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.4.6.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.4.6.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.4.6.4. Market Revenue and Forecast, by End Use (2017-2030)
13.4.7. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.4.8. North Africa
13.4.8.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.4.8.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.4.8.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.4.8.4. Market Revenue and Forecast, by End Use (2017-2030)
13.4.9. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.4.10. South Africa
13.4.10.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.4.10.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.4.10.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.4.10.4. Market Revenue and Forecast, by End Use (2017-2030)
13.4.10.5. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.4.11. Rest of MEA
13.4.11.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.4.11.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.4.11.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.4.11.4. Market Revenue and Forecast, by End Use (2017-2030)
13.4.11.5. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.5. Latin America
13.5.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.5.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.5.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.5.4. Market Revenue and Forecast, by End Use (2017-2030)
13.5.5. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.5.6. Brazil
13.5.6.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.5.6.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.5.6.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.5.6.4. Market Revenue and Forecast, by End Use (2017-2030)
13.5.7. Market Revenue and Forecast, by Size of Data Center (2017-2030)
13.5.8. Rest of LATAM
13.5.8.1. Market Revenue and Forecast, by IT Infrastructure (2017-2030)
13.5.8.2. Market Revenue and Forecast, by Power Distribution and Cooling Infrastructure (2017-2030)
13.5.8.3. Market Revenue and Forecast, by Tier Type (2017-2030)
13.5.8.4. Market Revenue and Forecast, by End Use (2017-2030)
13.5.8.5. Market Revenue and Forecast, by Size of Data Center (2017-2030)
Chapter 14. Company Profiles
14.1. Page Southerland Page
14.1.1. Company Overview
14.1.2. Product Offerings
14.1.3. Financial Performance
14.1.4. Recent Initiatives
14.2. Syska Hennessy Group
14.2.1. Company Overview
14.2.2. Product Offerings
14.2.3. Financial Performance
14.2.4. Recent Initiatives
14.3. Holder Construction Group
14.3.1. Company Overview
14.3.2. Product Offerings
14.3.3. Financial Performance
14.3.4. Recent Initiatives
14.4. Turner Construction Company
14.4.1. Company Overview
14.4.2. Product Offerings
14.4.3. Financial Performance
14.4.4. Recent Initiatives
14.5. Jones Engineering Group
14.5.1. Company Overview
14.5.2. Product Offerings
14.5.3. Financial Performance
14.5.4. Recent Initiatives
14.6. DPR Construction
14.6.1. Company Overview
14.6.2. Product Offerings
14.6.3. Financial Performance
14.6.4. Recent Initiatives
14.7. Arup Group
14.7.1. Company Overview
14.7.2. Product Offerings
14.7.3. Financial Performance
14.7.4. Recent Initiatives
14.8. Corgan Associates Inc.
14.8.1. Company Overview
14.8.2. Product Offerings
14.8.3. Financial Performance
14.8.4. Recent Initiatives
14.9. AECOM
14.9.1. Company Overview
14.9.2. Product Offerings
14.9.3. Financial Performance
14.9.4. Recent Initiatives
14.10. Gensler
14.10.1. Company Overview
14.10.2. Product Offerings
14.10.3. Financial Performance
14.10.4. Recent Initiatives
Chapter 15. Research Methodology
15.1. Primary Research
15.2. Secondary Research
15.3. Assumptions
Chapter 16. Appendix
16.1. About Us
16.2. Glossary of Terms
Buy This Premium Research Report Click Here@ https://www.precedenceresearch.com/checkout/1704
About Us
Precedence Research is a Canada/India based company and one of the leading providers of strategic market insights. We offer executive-level blueprints of markets and solutions beyond flagship surveys. Our repository covers consultation, syndicated market studies, and customized research reports. Through our services we aim at connecting an organization’s goal with lucrative prospects globally.
From gauging investment feasibility to uncovering hidden growth opportunities, our market studies cover in-depth analysis, which also is interspersed with relevant statistics. Recommendation are often enclosed within our reports with the sole intent of enabling organizations achieve mission-critical success.
Contact Us:
Precedence Research
Apt 1408 1785 Riverside Drive Ottawa, ON, K1G 3T7, Canada
Call: +1 9197 992 333
Email: sales@precedenceresearch.com
Website: https://www.precedenceresearch.com
